9798-5Revision CheckerISO/IEC DIS 9798-5
01The record02Free check 03Revision04Dated plan 05Kit and watch06Rules by market 07Answers

Home / Sources

Sources, and what each one proves

Four public sources and one preview. Each is used for a named set of fields, and no field is filled from anywhere else. The list is short because the public record for a draft in ballot is short.

SourceWhat it proves
The ISO record for the draftdesignation, edition, stage, stage date, committee, ICS and page count
The ISO record feed for the draftthe machine-readable copy the refresh script reads
The ISO record for the 2009 editionedition, page count, abstract, review history and the replacement notice
The ISO record feed for the 2009 editionthe stage history the refresh script compares against
Publisher preview of ISO/IEC 9798-5:2009contents, foreword, introduction, terms, notation and clauses 4 to 4.2

What no public source proves

The DIS text, the close of voting, the approval date, the publication date and any national adoption date. Those are not on this site as facts. The planning date is labelled an estimate wherever it appears, and its basis is stated on the revision page and in every result.

The preview, and its limit

The publisher preview of the 2009 edition exposes the contents, the foreword, the introduction, the terms, the notation and clauses 4 to 4.2. It stops before the later mechanism clauses, the annexes and the bibliography. Pages for those clauses therefore record the obligation from the contents and the introduction, and say that the clause body is not public. That is a limit of the record, not a gap filled by guesswork.

How to correct a source

Email support@theartofservice.com with the URL and the line. A correction is published with a date in the changelog.

Not legal advice; does not certify.